Do You Need a Permit for a Retaining Wall in Monterey County?

Most retaining walls need a building permit. California’s code exempts only small walls, and the exemption is narrow. The City of Carmel-by-the-Sea’s Building Safety Division prints the state rule this way: “Retaining walls that are not over 4 feet (1219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II, or IIIA liquids.”

Two details in that sentence decide your project. Height is measured from the bottom of the footing, not from the ground you can see. A surcharge, meaning extra load behind the wall, cancels the exemption at any height.

That state number is a floor, not a promise. Cities and counties set their own stricter lines. The City of Monterey exempts only walls “less than 3 feet high measured from grade unless supporting a surcharge.” Santa Cruz County uses three feet as well. Confirm your retaining wall with the building department that covers your address.

Why can a 3-foot wall still need a permit?

Because the code measures the whole wall, footing and all. A block wall holding three feet of soil often sits on a footing a foot or more deep. Measured from the bottom of that footing, the wall can already be past four feet.

Surcharge is the second reason. Carmel’s guidance says “Surcharges may be imposed on the wall by earth or by nearby structures, parking, or roadways.” Its drawings show three walls under four feet that still need a permit: one beside a house, one under a parked car, one under a hillside.

The test is a line. Carmel draws it at 45 degrees up from the base of the footing, and anything the line touches counts as a surcharge. A driveway, a patio slab or a slope above your wall can put you over. Confirm with the building department.

Who issues the permit where you live?

Counties permit unincorporated land. Inside city limits, the city permits the work.

Where the wall sitsWho issues the permitPublished starting point
Unincorporated Monterey County: Pebble Beach, Carmel Valley, Prunedale, Carmel HighlandsHousing and Community Development, at the county Permit CenterCounty publishes a Retaining Wall Construction handout. Confirm the trigger with the county.
SalinasPermit Services at the city Permit CenterConfirm the trigger with the city
MontereyCommunity Development, Building and Safety DivisionNo permit under “3 feet high measured from grade unless supporting a surcharge”
Pacific GroveCommunity Development, Building Division”A building permit is required for almost all projects, both interior and exterior”
Carmel-by-the-SeaCommunity Planning and Building: Planning Division, then Building Safety DivisionThe 4-foot footing-to-top exemption, plus city design review
MarinaBuilding Division of the Community Development DepartmentConfirm the trigger with the city

On the Santa Cruz County side, unincorporated Aptos, Soquel and Rio del Mar go through Community Development and Infrastructure and its Unified Permit Center. Hollister and San Benito County run their own building offices. Confirm with the department that covers the address.

When does a retaining wall need an engineer?

Carmel states it plainly: “When a permit is required under the Building Code for construction of a garden/retaining wall, the wall must be designed by a State registered structural or civil engineer.”

Santa Cruz County draws the line at four feet: “Retaining walls four feet or taller require a permit submitted through ePlan Review with structural engineering.” The City of Monterey asks for plans by a licensed professional on “Retaining/Basement/Foundation Walls with more than 6 feet of backfill.”

We build to the engineer’s plans and to the permit. Our crew does the excavation, the footing, the steel and the poured concrete work. Confirm the requirement with your building department.

What do coastal, design and tree rules add on the Peninsula?

Much of this coast sits in the California Coastal Zone. The California Coastal Commission says “Development within the coastal zone generally may not commence until a coastal development permit has been issued by either the Commission or a local government.” The Coastal Act defines development broadly, well past buildings.

Carmel-by-the-Sea adds design review. The city says “Most exterior alterations and/or site coverage changes require approval from the Planning Department.” Under its zoning table, walls “with the exposed face visible from the street shall have a maximum height of three feet.”

Trees count in Carmel too. The Forest and Beach Commission acts on “matters involving construction in which root cutting or root crown coverage is involved.” A wall footing inside an oak or pine root zone is that commission’s call.

Pebble Beach adds a private layer. The Del Monte Forest Property Owners association describes review under the “Architectural Standards and Residential Guidelines for Del Monte Forest (Jan 2002)”, and notes that “homes in the coastal zone may require a Monterey County permit” too. Pacific Grove wants the planning permit first: “Anytime you are changing the exterior of a building, you need a planning permit,” including changes to paving coverage. Confirm with the city.

What about terraced walls and drainage behind the wall?

Two short walls stepped up a slope are not automatically two exempt walls. The upper wall and the soil it holds can sit inside the lower wall’s surcharge line. Santa Cruz County allows its own standard wall detail only where “the retaining wall retains less than 4 feet of material with or without a surcharge, unless the surcharge is caused by a building.” Confirm terracing with the building department.

Drainage is what keeps a wall standing through a wet Monterey Bay winter. The county’s published concrete wall detail calls for a minimum of 12 inches of half-inch drain rock behind the wall, a minimum 4-inch perforated pipe “sloped to daylight”, and drain rock carried up to within about a foot of grade. We build that gravel and pipe into our walls, along with the block and stone work that finishes them.

What does a retaining wall cost in 2026?

These are published market numbers from national cost guides, not our price list. Walls are priced off the site, and our estimates are free.

What is pricedPublished range per square foot of wall faceKind of source
Any retaining wall, all materials$20 to $53, average $33National cost guide, 2026
Poured concrete$20 to $40National cost guide, 2026
Concrete block$15 to $40National cost guide, 2026
Natural stone$20 to $90National cost guide, 2026
Concrete wall, second guide$10 to $100A second national guide
Building permit, not per square foot$40 to $450, by locationBoth national guides

Engineering is its own line item. One guide says a wall over four feet “will need to be designed by a structural engineer,” but neither guide publishes a design fee we could verify. Permit cost scales with the wall: Santa Cruz County says its fees “are based on department review fees and square footage of the face of the retaining wall.” A wall reaching into the public right of way in Pacific Grove needs an encroachment permit, published at $650 in the city fee schedule.

What is the first step on your wall?

Measure the wall from the bottom of the footing to the top, then answer the surcharge question. Those two answers tell you whether you have a low garden wall or an engineered, permitted structure.

We build concrete and block retaining walls across the Monterey Bay area, from the Monterey Peninsula to Santa Cruz and Hollister. Send the form for a free estimate or call or text (831) 262-9943.

Frequently asked questions

How tall can a retaining wall be without a permit in California?
The state exemption covers a wall "not over 4 feet in height measured from the bottom of the footing to the top of the wall," and only when the wall supports no surcharge. Local rules can be tighter. The City of Monterey exempts only walls under 3 feet measured from grade, and Santa Cruz County also uses 3 feet. Confirm with the building department that covers your address.
Does a 3-foot retaining wall need a permit in Monterey County?
It can. The code measures from the bottom of the footing, so a wall showing 3 feet of face is often more than 4 feet overall. A surcharge such as a driveway or a slope above the wall removes the exemption at any height. Unincorporated areas go through the county's Housing and Community Development permit center, so confirm the trigger with the county.
What counts as a surcharge behind a retaining wall?
Carmel's building guidance says "Surcharges may be imposed on the wall by earth or by nearby structures, parking, or roadways." In plain terms that means a house, a driveway, a parking area or a slope close enough to press on the soil your wall holds. Carmel tests it with a 45 degree line drawn up from the base of the footing. Confirm your own layout with the building department.
Does my retaining wall need an engineer?
In Carmel-by-the-Sea, any wall that needs a building permit "must be designed by a State registered structural or civil engineer." Santa Cruz County requires structural engineering at 4 feet and taller. The City of Monterey asks for a licensed professional's plans on walls with more than 6 feet of backfill. We build to the engineer's plans and to the permit, so confirm the requirement with the building department.
Who handles a retaining wall permit in Salinas?
Permit Services at the City of Salinas Permit Center. The city describes the job as "Review, issue, and inspect Building, Simple, Sign, and Demolition Permits." Marina, Monterey, Pacific Grove and Carmel-by-the-Sea each run their own building counter, and unincorporated areas go to the county. Confirm the trigger and the fee with the city before you plan the wall.
Do I need a coastal permit for a wall in Carmel or Pebble Beach?
Possibly. The California Coastal Commission says development in the coastal zone "generally may not commence until a coastal development permit has been issued by either the Commission or a local government." Carmel also runs design review on exterior and site coverage changes, and Del Monte Forest homes go through the Pebble Beach architectural review process as well as a county permit. Confirm with the planning counter before you order material.
Is this what Aguilar and Sons Construction charges?
No. Every figure on this page comes from published cost guides or from city, county and state sources, not from our price list. What your wall costs depends on the height, the footing, the soil, the access and the finish. Our estimates are free and done on site, so call or text (831) 262-9943 and we will price your wall.
Free Estimates

Get In Touch With Aguilar & Sons Construction

Call or text (831) 262-9943, or send the form with a few details about the project. Photos of the area help, and we will set a time to come out and measure.

Get a Free Quote

Tell us about the job. We will get right back to you.

Call (831) 262-9943